房屋漏水、发霉的事件屡见不鲜
House leakage and mildew are common
人们也渐渐意识到防水的重要性
People gradually realized the importance of waterproof
但是为何有些明明已经做好了防水
But why are some of them waterproof
可还是“屋漏偏逢连夜雨”
But it's still "the house leaks every night"
这边漏水,那边渗漏
There's a leak here, there's a leak there
问题到底出现在哪里呢?
Where is the problem?
美好生活,还是要从查漏补缺开始
A better life starts with finding out and filling in the gaps
选择合适的防水涂料很重要
It's important to choose the right waterproof coating
一些基础施工细节更不能忽视!
Some foundation construction details can not be ignored!
如果不想日后重新返工,那就做好防水工程!
If you don't want to rework in the future, then do a good waterproof project!
[09.我想想.gif]
[09. Let me see. GIF]
今天联sir就带大家看下
Today, sir will show you
专业的防水施工步骤及防水细节!
Professional waterproof construction steps and waterproof details!
联塑专业的防水施工步骤及细节规范
Waterproof construction steps and details of Liansu specialty
步骤1
Step 1
基层检测:无明水、无油污、无灰尘
Base test: no water, oil and dust
油污会隔绝防水层,灰尘容易造成防水涂料没有接触到水泥基层,导致防水层开裂脱落,影响防水效果。
The oil will isolate the waterproof layer, and the dust will easily cause the waterproof coating not to contact the cement base, which will cause the waterproof layer to crack and fall off, affecting the waterproof effect.
步骤2
Step 2
基层处理、修补
Base treatment and repair
处理疏松基层,一定要铲到坚硬的基层,不然也容易导致防水层开裂脱落;坑洼的地方,要进行修补。
In the treatment of loose base course, it is necessary to shovel to the hard base course, otherwise it is easy to cause the waterproof layer to crack and fall off; the potholes shall be repaired.
步骤3
Step 3
充分湿润,无明水
Fully wet without open water
水泥基层干燥容易吸收水分,因为防水涂料是有乳液+粉料混合而成,充分湿润就减少水泥对防水中乳液的吸收,让乳液和粉料可以在基层上充分发挥化学作用,达到防水的效果。若有明水,相当于在防水涂料中加入了水,会影响防水效果。
Cement base drying is easy to absorb moisture, because waterproofing coating is mixed with emulsion and powder, and full wetting will reduce the absorption of cement to emulsion in water proofing, so that emulsion and powder can give full play to the chemical effect at the grass-roots level and achieve the effect of waterproofing. If there is open water, it is equivalent to adding water into the waterproof coating, which will affect the waterproof effect.
细节:防潮墙面要加固!
Detail: moistureproof wall should be reinforced!
为何要处理基层,加固墙面?
Why should we deal with the base course and reinforce the wall?
做防水涂刷之前,若墙体表面有明水、灰尘、疏松泥沙,会导致防水涂料不能充分接触到基层,防水层就容易开裂脱落,形成空鼓现象,所以要先处理疏松基层,铲到坚硬基层后,然后再使用墙面加固剂进行加强处理。
Before the waterproof coating, if there is open water, dust and loose sediment on the wall surface, the waterproof coating will not fully contact the base layer, and the waterproof layer will easily crack and fall off, forming hollowing phenomenon. Therefore, the loose base layer should be treated first, shoveled to the hard base layer, and then the wall surface reinforcement agent should be used for strengthening treatment.
07.
Seven
sept
Sept
07.
Seven
sept
Sept
07.
Seven
sept
Sept
为何要使用墙面加固剂?
Why use wall reinforcement?
墙面加固剂具有优异的渗透性,通过刷涂在水泥砂浆层,使砂浆层硬实了,可有效提高灰浆或腻子和墙体表面的粘接强度,从而防止空鼓的现象发生。
The wall reinforcing agent has excellent permeability. By brushing on the cement mortar layer, the mortar layer is hard and solid, which can effectively improve the bonding strength between the mortar or putty and the wall surface, so as to prevent hollowing.
联sir推荐使用联塑防潮墙面加固剂LS100
LS100 is recommended by unisir
采用纳米级优质高分子聚合物乳液
Nanometer high quality polymer emulsion was used.
粒径小,渗透力极强,
The particle size is small and the permeability is very strong,
引进特种功能单体,高效封闭
Introduction of special functional monomer, highly efficient closure
对底材附着力强,防潮防霉又抗碱
Strong adhesion to substrate, moisture-proof, mildew proof and alkali resistant
具体施工步骤:
Specific construction steps:
① 基层表面应平整且无浮灰,处理疏松基层,一定要铲到坚硬的基层;旧漆膜和油渍需铲除清理
① The surface of base course shall be flat and free of floating ash. Loose base course shall be treated by shovel to hard base course; old paint film and oil stain shall be removed and cleaned
② 宜先用小部分清水稀释,以有利于充分渗透密实基面
② It is advisable to dilute with a small part of clear water first, so as to facilitate the full penetration of the dense foundation surface
备注:以18公斤/桶的产品含量计算,水的比例约为10%,即1.8L水,以550毫升的矿泉水瓶计算,约为3.2瓶水。
Note: Based on the product content of 18kg / barrel, the proportion of water is about 10%, i.e. 1.8L water, and based on 550ml mineral water bottle, it is about 3.2 bottles of water.
③ 用滚筒或者毛刷均匀涂刷一遍或多遍
③ Brush one or more times evenly with roller or brush
④ 常温下干燥时间约1小时,然后可进行下道工序
④ Drying time at room temperature is about 1 hour, and then the next process can be carried out
① 处理疏松基层
① Treatment of loose base
② 清水稀释涂料
② Water diluted coating
③ 均匀涂刷
③ Brush evenly
④ 常温下干燥
④ Drying at room temperature
参考用量:1kg墙面加固剂可涂刷8㎡左右,刷一遍(仅供参考,实际视基材情况而定)。
Reference dosage: 1 kg wall reinforcing agent can be brushed about 8 ㎡, once (for reference only, depending on the actual situation of the substrate).
适用范围:主要用于墙面批刮腻子前的封固防潮处理、墙面抹灰工程和瓷砖铺贴前的基层封闭。
Scope of application: mainly used for sealing and moistureproof treatment before applying putty to the wall, wall plastering works and base sealing before tiling.